Substation Scout

Kewanee substation interconnection queue

2 active projects totalling 53.1 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
53.1active MW
6total filed
Queue IDProjectkVMWResourceStatus
Q60 Kewanee 138kV 138 40.2 Wind Withdrawn
P11 Bishop Hill WF 138 40 Wind In Service
Q39 Kewanee 138kV 138 21 Wind Withdrawn
AA2-039 Kewanee 138 kV 138 19.5 Wind Withdrawn
AC1-033 Midland Wind Farm 138 13.1 Wind In Service
W3-133 Kewanee n/r 2.5 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.