Kewanee substation interconnection queue
2 active projects totalling 53.1 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
53.1active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q60 | Kewanee 138kV | 138 | 40.2 | Wind | Withdrawn |
| P11 | Bishop Hill WF | 138 | 40 | Wind | In Service |
| Q39 | Kewanee 138kV | 138 | 21 | Wind | Withdrawn |
| AA2-039 | Kewanee 138 kV | 138 | 19.5 | Wind | Withdrawn |
| AC1-033 | Midland Wind Farm | 138 | 13.1 | Wind | In Service |
| W3-133 | Kewanee | n/r | 2.5 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.