Kewanee - E.D. Edwards substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI2-060 Kewanee - E.D. Edwards 138 kV 138 40.7 Solar Withdrawn
AD1-031 Kewanee - E.D. Edwards 138 kV 138 26.6 Solar Withdrawn
AH1-297 Kewanee - E.D. Edwards 138 kV 138 26 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.