Kewanee - E.D. Edwards substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-060 | Kewanee - E.D. Edwards 138 kV | 138 | 40.7 | Solar | Withdrawn |
| AD1-031 | Kewanee - E.D. Edwards 138 kV | 138 | 26.6 | Solar | Withdrawn |
| AH1-297 | Kewanee - E.D. Edwards 138 kV | 138 | 26 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.