Kewanee - E.D. Edwards substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Kewanee - E.D. Edwards as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Oct 2024 to Jun 2027 (3 filings).
Transmission owner as filed: ComEd (1 filing).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-060 | Kewanee - E.D. Edwards 138 kV | 138 | 40.7 | Solar | Withdrawn | Oct 2024 |
| AD1-031 | Kewanee - E.D. Edwards 138 kV | 138 | 26.6 | Solar | Withdrawn | Jun 2027 |
| AH1-297 | Kewanee - E.D. Edwards 138 kV | 138 | 26 | Wind | Withdrawn | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Henry County, IL
Other PJM queue substations in Stark County, IL
- Kewanee: 2 active, 53.1 MW of 6 filed
- Edwards - Kewanee East: none active of 2 filed
- Toulon: none active of 2 filed
Site Scanner