Kewanee - E.D. Edwards substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Kewanee - E.D. Edwards as the point of interconnection, all in IL.

Target commercial operation dates as filed run from Oct 2024 to Jun 2027 (3 filings).

Transmission owner as filed: ComEd (1 filing).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-060 Kewanee - E.D. Edwards 138 kV 138 40.7 Solar Withdrawn Oct 2024
AD1-031 Kewanee - E.D. Edwards 138 kV 138 26.6 Solar Withdrawn Jun 2027
AH1-297 Kewanee - E.D. Edwards 138 kV 138 26 Wind Withdrawn Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Henry County, IL

All 9 PJM queue filings in Henry County, IL.

Other PJM queue substations in Stark County, IL

All 9 PJM queue filings in Stark County, IL.