Henry, IL interconnection queue
2 active projects totalling 79.3 MW in the PJM queue, plus 7 with terminal status (shown greyed).
2active projects
79.3active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U4-027 | Normandy-Kewanee 138kV | 138 | 100 | Gas | Withdrawn |
| C01-1360 | Normandy - Kewanee 138 kV | 138 | 66.2 | Wind | Active |
| AE1-193 | Crete 345 kV | 345 | 65 | Wind | Withdrawn |
| AI2-060 | Kewanee - E.D. Edwards 138 kV | 138 | 40.7 | Solar | Withdrawn |
| Q60 | Kewanee 138kV | 138 | 40.2 | Wind | Withdrawn |
| AD1-031 | Kewanee - E.D. Edwards 138 kV | 138 | 26.6 | Solar | Withdrawn |
| Q39 | Kewanee 138kV | 138 | 21 | Wind | Withdrawn |
| AA2-039 | Kewanee 138 kV | 138 | 19.5 | Wind | Withdrawn |
| AC1-033 | Midland Wind Farm | 138 | 13.1 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.