Stark, IL interconnection queue
1 active project totalling 30 MW in the PJM queue, plus 8 with terminal status (shown greyed).
1active projects
30active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-340 | Toulon 138kV | 138 | 210 | Solar | Withdrawn |
| AH2-342 | Edwards - Kewanee East 138kV | 138 | 168 | Solar | Withdrawn |
| AH2-341 | Toulon 138 kV | 138 | 140 | Battery | Withdrawn |
| AH2-343 | Edwards - Kewanee East 138kV | 138 | 112 | Battery | Withdrawn |
| L05_CE22 | Camp Grove Wind Farm | n/r | 30 | Wind | In Service |
| AG2-527 | Kewanee-Toulon 138 kV | 138 | 26 | Wind | Withdrawn |
| AH1-297 | Kewanee - E.D. Edwards 138 kV | 138 | 26 | Wind | Withdrawn |
| P39 | Kewanee-Powerton 138kV | 138 | 12 | Wind | Withdrawn |
| W3-133 | Kewanee | n/r | 2.5 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.