1 active project totalling 30 MW in the PJM queue, plus 8 with terminal status (shown greyed).

1active projects
30active MW
9total filed
Queue IDProjectkVMWResourceStatus
AH2-340 Toulon 138kV 138 210 Solar Withdrawn
AH2-342 Edwards - Kewanee East 138kV 138 168 Solar Withdrawn
AH2-341 Toulon 138 kV 138 140 Battery Withdrawn
AH2-343 Edwards - Kewanee East 138kV 138 112 Battery Withdrawn
L05_CE22 Camp Grove Wind Farm n/r 30 Wind In Service
AG2-527 Kewanee-Toulon 138 kV 138 26 Wind Withdrawn
AH1-297 Kewanee - E.D. Edwards 138 kV 138 26 Wind Withdrawn
P39 Kewanee-Powerton 138kV 138 12 Wind Withdrawn
W3-133 Kewanee n/r 2.5 Wind Withdrawn