Edwards - Kewanee East substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-342 | Edwards - Kewanee East 138kV | 138 | 168 | Solar | Withdrawn |
| AH2-343 | Edwards - Kewanee East 138kV | 138 | 112 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.