Fair Wind Project
PJM queue ID T16
Fair Wind Project (T16) is listed in the PJM interconnection queue as a 6 MW wind project in Garrett County, MD. The filing names Kelso Gap as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2015.
| Queue ID | T16 |
|---|---|
| Project name | Fair Wind Project |
| Status (as published) | In Service |
| Substation | Kelso Gap |
| Point of interconnection | Kelso Gap 138kV |
| County | Garrett |
| State | MD |
| Voltage | 138 kV |
| Capacity | 6 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2015-10-31 |
| Source dataset | serial |
Same substation and county
Kelso Gap substation: 3 requests in the PJM queue, 3 active totaling 126 MW.
Garrett, MD: 32 requests in the PJM queue, 13 active totaling 1,202.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 30 |
| MW capacity | 6 |
| MFO | 30 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.