Frazeysburg substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Frazeysburg as the point of interconnection, all in Muskingum County, OH.
Target commercial operation dates as filed run from Dec 2018 to Dec 2023 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-024 | Frazeysburg 138kV | 138 | 57 | Solar | Withdrawn | Dec 2018 |
| AD1-015 | Muskingum Solar | 138 | 57 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Muskingum County, OH
- Guernsey - Vassell: 2 active, 1,862.2 MW of 2 filed
- Ohio Central: 3 active, 1,623.4 MW of 4 filed
- Hillcrest: 3 active, 120 MW of 6 filed
- Conesville #5: none active of 3 filed
- Conesville #6: none active of 3 filed