Ohio Central substation interconnection queue
3 active projects totalling 1,623.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
1,623.4active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1886 | Ohio Central 345 kV | 345 | 1,000 | Battery | Active |
| S101 | Dresden | 138 | 580 | Gas | In Service |
| P02 | Ohio Central 138kV | 138 | 550 | Gas | Withdrawn |
| AC1-100 | Dresden | 138 | 43.4 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.