Hillcrest Solar I

PJM queue ID AE1-120

Hillcrest Solar I (AE1-120) is listed in the PJM interconnection queue as a 44 MW solar project in Brown County, OH. The filing names Hillcrest as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2020.

Queue IDAE1-120
Project nameHillcrest Solar I
Status (as published)In Service
SubstationHillcrest
Point of interconnectionHillcrest 138 kV
CountyBrown
StateOH
Voltage138 kV
Capacity44 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2020-12-31
Source datasetserial

Same substation and county

Hillcrest substation: 6 requests in the PJM queue, 3 active totaling 120 MW.

Queue IDProjectMWResourceStatus
AB1-014Hillcrest Solar Facility47.5SolarIn Service
AC2-066Hillcrest Solar Facility28.5SolarIn Service
AG2-359Hillcrest 345 kV125BatteryWithdrawn
AD2-151Hillcrest 345kV42SolarWithdrawn
AA1-126Hillcrest 138kV7.6SolarWithdrawn

Brown, OH: 15 requests in the PJM queue, 4 active totaling 124.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0
MW capacity44
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.