Oak Trail Solar

PJM queue ID AD2-160

Oak Trail Solar (AD2-160) is listed in the PJM interconnection queue as a 32.8 MW solar project in Currituck County, NC. The filing names Hickory-Moyock as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 1, 2023.

Queue IDAD2-160
Project nameOak Trail Solar
Status (as published)In Service
SubstationHickory-Moyock
Point of interconnectionHickory-Moyock 230kV
CountyCurrituck
StateNC
Voltage230 kV
Capacity32.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-07-01
Source datasetserial

Same substation and county

Hickory-Moyock substation: 3 requests in the PJM queue, 2 active totaling 67.3 MW.

Queue IDProjectMWResourceStatus
AE2-253Oak Trail Solar34.5SolarIn Service
AI2-393Hickory-Moyock 230 kV17.7SolarWithdrawn

Currituck, NC: 17 requests in the PJM queue, 5 active totaling 305.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy50
MW capacity32.8
MFO50

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.