Oak Trail Solar
PJM queue ID AE2-253
Oak Trail Solar (AE2-253) is listed in the PJM interconnection queue as a 34.5 MW solar project in Currituck County, NC. The filing names Hickory-Moyock as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 15, 2023.
| Queue ID | AE2-253 |
|---|---|
| Project name | Oak Trail Solar |
| Status (as published) | In Service |
| Substation | Hickory-Moyock |
| Point of interconnection | Hickory-Moyock 230 kV |
| County | Currituck |
| State | NC |
| Voltage | 230 kV |
| Capacity | 34.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-07-15 |
| Source dataset | serial |
Same substation and county
Hickory-Moyock substation: 3 requests in the PJM queue, 2 active totaling 67.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-160 | Oak Trail Solar | 32.8 | Solar | In Service |
| AI2-393 | Hickory-Moyock 230 kV | 17.7 | Solar | Withdrawn |
Currituck, NC: 17 requests in the PJM queue, 5 active totaling 305.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 50 |
| MW capacity | 34.5 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.