Clermont County Solar Project (AE2-318) is listed in the PJM interconnection queue as a 67.2 MW solar project in Clermont County, OH. The filing names Ford-Cedarville as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2025.

Queue IDAE2-318
Project nameClermont County Solar Project
Status (as published)Suspended
SubstationFord-Cedarville
Point of interconnectionFord-Cedarville 138 kV
CountyClermont
StateOH
Voltage138 kV
Capacity67.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-12-31
Source datasetserial

Same substation and county

Ford-Cedarville substation: 2 requests in the PJM queue, 1 active totaling 67.2 MW.

Queue IDProjectMWResourceStatus
AG2-118Ford-Cedarville 138 kV56.2SolarWithdrawn

Clermont, OH: 23 requests in the PJM queue, 8 active totaling 1,194.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity67.2
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.