Erie Solar

PJM queue ID AF1-006

Erie Solar (AF1-006) is listed in the PJM interconnection queue as a 12.8 MW solar project in Erie County, PA. The filing names Fairview East as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2024.

Queue IDAF1-006
Project nameErie Solar
Status (as published)In Service
SubstationFairview East
Point of interconnectionFairview East 34.5 kV
CountyErie
StatePA
Voltage34.5 kV
Capacity12.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-12-31
Source datasetserial

Same substation and county

Fairview East substation: 2 requests in the PJM queue, 1 active totaling 12.8 MW.

Queue IDProjectMWResourceStatus
AI2-056Fairview East 34.5 kV3.8SolarWithdrawn

Erie, PA: 42 requests in the PJM queue, 7 active totaling 1,217.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12.8
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first