Briel Farm Solar (AD2-021) is listed in the PJM interconnection queue as a 1.3 MW solar project in Henrico County, VA. The filing names Elko as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 30, 2020.

Queue IDAD2-021
Project nameBriel Farm Solar
Status (as published)In Service
SubstationElko
Point of interconnectionElko 34.5 kV
CountyHenrico
StateVA
Voltage34.5 kV
Capacity1.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2020-12-30
Source datasetserial

Same substation and county

Elko substation: 2 requests in the PJM queue, 2 active totaling 12.7 MW.

Queue IDProjectMWResourceStatus
AC2-137Briel Farm Solar11.4SolarIn Service

Henrico, VA: 17 requests in the PJM queue, 11 active totaling 227.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1.2
MW capacity1.3
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first