Doubs substation interconnection queue

2 active projects totalling 450 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
450active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1767 Doubs 230 kV 230 350 Battery Active
C01-1478 Doubs 230 kV 230 140 Battery Withdrawn
C01-2012 Doubs 230 kV 230 100 Battery Active
AC1-139 Doubs 230kV 230 38.8 Solar Withdrawn
AB2-129 Potomac Solar, LLC 230 30.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.