Metropolitan Court substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
V3-056 Metropolitan Court 34.5kV 34.5 50 Other Withdrawn
W3-070 Metropolitan Court 34.5kV 34.5 50 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.