Carroll-Monocacy substation interconnection queue

2 active projects totalling 13.3 MW in the PJM queue.

2active projects
13.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB1-124 Legore Bridge Solar Center Facility 34.5 7.6 Solar In Service
AB1-125 Biggs Ford Solar Facility 34.5 5.7 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.