Doubs 230 kV
PJM queue ID C01-1767
Doubs 230 kV (C01-1767) is listed in the PJM interconnection queue as a 350 MW battery project in Frederick County, MD. The filing names Doubs as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | C01-1767 |
|---|---|
| Project name | Doubs 230 kV |
| Status (as published) | Active |
| Substation | Doubs |
| Point of interconnection | Doubs 230 kV |
| County | Frederick |
| State | MD |
| Voltage | 230 kV |
| Capacity | 350 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Doubs substation: 5 requests in the PJM queue, 2 active totaling 450 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2012 | Doubs 230 kV | 100 | Battery | Active |
| C01-1478 | Doubs 230 kV | 140 | Battery | Withdrawn |
| AC1-139 | Doubs 230kV | 38.8 | Solar | Withdrawn |
| AB2-129 | Potomac Solar, LLC | 30.4 | Solar | Withdrawn |
Frederick, MD: 34 requests in the PJM queue, 8 active totaling 923.1 MW.
A substation with the same name is named in PJM transmission planning materials: Doubs (APS, 27 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Zenobe Adamstown, LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 350.0 |
| MW capacity | 350.0 |
| MFO | 350.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/3/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.