North Wales substation interconnection queue
2 active projects totaling 38 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name North Wales as the point of interconnection, all in Montgomery County, PA.
Target commercial operation dates as filed run from Sep 2002 to Jun 2022 (4 filings).
2active projects
38active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| G22 | Merck | 34.5 | 38 | Gas | In Service | Sep 2002 |
| AB1-033 | Morris Road | 34.5 | 4.1 | Other | Deactivated | Jun 2020 |
| V1-028 | Morris Road | n/r | 2 | Other | Deactivated | May 2009 |
| AB1-031 | North Wales 34kV | 34 | 0 | Other | Withdrawn | n/r |
| AE1-221 | West Point Cogeneration Facility | 34.5 | 0 | Gas | In Service | Jun 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.