Substation Scout

Limerick substation interconnection queue

1 active project totalling 348 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
348active MW
5total filed
Queue IDProjectkVMWResourceStatus
B12 Limerick 230kV 230 500 Gas Withdrawn
C01-1055 Limerick 500 kV 500 348 Nuclear Active
E17 Limerick n/r 75 Gas Withdrawn
V1-026 Limerick n/r 20 Nuclear Withdrawn
V1-027 Limerick n/r 20 Nuclear Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.