Limerick substation interconnection queue
1 active project totaling 348 MW in the PJM queue, plus 4 with terminal status (shown grayed).
5 PJM queue filings name Limerick as the point of interconnection, all in Montgomery County, PA.
Target commercial operation dates as filed run from Dec 2003 to Jun 2031 (4 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PECO (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| B12 | Limerick 230kV | 230 | 500 | Gas | Withdrawn | n/r |
| C01-1055 | Limerick 500 kV | 500 | 348 | Nuclear | Active | Jun 2031 |
| E17 | Limerick | n/r | 75 | Gas | Withdrawn | Dec 2003 |
| V1-026 | Limerick | n/r | 20 | Nuclear | Withdrawn | Apr 2011 |
| V1-027 | Limerick | n/r | 20 | Nuclear | Withdrawn | Apr 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Limerick (PECO, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Montgomery County, PA
- North Wales: 2 active, 38 MW of 5 filed
- Barbadoes: none active of 3 filed
- Cromby: none active of 3 filed
- Lock: none active of 2 filed