Barbadoes substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Barbadoes as the point of interconnection, all in Montgomery County, PA.
Target commercial operation dates as filed run from Aug 2008 to Oct 2028 (3 filings).
Transmission owner as filed: PECO (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2200 | Barbadoes 230 kV | 230 | 398.2 | Battery | Withdrawn | Oct 2028 |
| Y1-057 | Barbadoes Energy Storage Unit | 34 | 0.1 | Battery | Deactivated | Dec 2013 |
| U3-001 | AES Energy Storage Unit | 34 | 0 | Battery | Withdrawn | Aug 2008 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Barbadoes (PECO, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Montgomery County, PA
- Limerick: 1 active, 348 MW of 5 filed
- North Wales: 2 active, 38 MW of 5 filed
- Cromby: none active of 3 filed
- Lock: none active of 2 filed