Lone Tree Wind

PJM queue ID AC1-214

Lone Tree Wind (AC1-214) is listed in the PJM interconnection queue as a 19 MW wind project in Bureau County, IL. The filing names Crescent Ridge as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 30, 2020.

Queue IDAC1-214
Project nameLone Tree Wind
Status (as published)In Service
SubstationCrescent Ridge
Point of interconnectionCrescent Ridge
CountyBureau
StateIL
VoltageNot reported
Capacity19 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2020-12-30
Source datasetserial

Same substation and county

Crescent Ridge substation: 6 requests in the PJM queue, 2 active totaling 28.7 MW.

Queue IDProjectMWResourceStatus
Z1-072Crescent Ridge Wind Farm9.7WindIn Service
AD1-066Crescent Ridge9.9SolarWithdrawn
P40Providence Heights WF4WindWithdrawn
AF2-070Crescent Ridge 138 kV3.1WindWithdrawn
AF2-069Lone Tree Wind Farm2WindWithdrawn

Bureau, IL: 23 requests in the PJM queue, 4 active totaling 91.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy79.4
MW capacity19
MFO79.4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first