Angelina Solar I

PJM queue ID AF1-071

Angelina Solar I (AF1-071) is listed in the PJM interconnection queue as a 6.8 MW solar project in Preble County, OH. The filing names College Corner as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of April 1, 2028.

Queue IDAF1-071
Project nameAngelina Solar I
Status (as published)Under Construction
SubstationCollege Corner
Point of interconnectionCollege Corner 138 kV
CountyPreble
StateOH
Voltage138 kV
Capacity6.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-04-01
Source datasetserial

Same substation and county

College Corner substation: 6 requests in the PJM queue, 2 active totaling 37.2 MW.

Queue IDProjectMWResourceStatus
AC2-111Angelina Solar I30.4SolarUnder Construction
AF2-211College Corner 138 kV60SolarWithdrawn
AI2-238College Corner 138 kV39.4SolarWithdrawn
AG1-049College Corner 138 kV17.6SolarWithdrawn
AE1-008College Corner 138 kV7.6SolarWithdrawn

Preble, OH: 15 requests in the PJM queue, 5 active totaling 79.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy18
MW capacity6.84
MFO98

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first