Madison - Tanners Creek substation interconnection queue

1 active project totaling 10.6 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Madison - Tanners Creek as the point of interconnection, all in Henry County, IN.

Target commercial operation dates as filed run from Sep 2023 to Mar 2027 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEP (1 filing).

1active projects
10.6active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-484 Madison - Tanners Creek 138 kV 138 115 Solar Withdrawn Sep 2023
AG2-487 Madison - Tanners Creek 138 kV 138 10.6 Solar Active Mar 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Madison - Tanners Creek” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Henry County, IN

All 8 PJM queue filings in Henry County, IN.