Angelina Solar I
PJM queue ID AC2-111
Angelina Solar I (AC2-111) is listed in the PJM interconnection queue as a 30.4 MW solar project in Preble County, OH. The filing names College Corner as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of April 1, 2027.
| Queue ID | AC2-111 |
|---|---|
| Project name | Angelina Solar I |
| Status (as published) | Under Construction |
| Substation | College Corner |
| Point of interconnection | College Corner 138kV |
| County | Preble |
| State | OH |
| Voltage | 138 kV |
| Capacity | 30.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-04-01 |
| Source dataset | serial |
Same substation and county
College Corner substation: 6 requests in the PJM queue, 2 active totaling 37.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-071 | Angelina Solar I | 6.8 | Solar | Under Construction |
| AF2-211 | College Corner 138 kV | 60 | Solar | Withdrawn |
| AI2-238 | College Corner 138 kV | 39.4 | Solar | Withdrawn |
| AG1-049 | College Corner 138 kV | 17.6 | Solar | Withdrawn |
| AE1-008 | College Corner 138 kV | 7.6 | Solar | Withdrawn |
Preble, OH: 15 requests in the PJM queue, 5 active totaling 79.1 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-14 | Status change | n/a | Engineering and Procurement → Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 80 |
| MW capacity | 30.4 |
| MFO | 80 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.