Madison-Tanners Creek substation interconnection queue

1 active project totalling 91.5 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
91.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
AE2-297 Bellflower Solar 1 138 91.5 Solar In Service
AA2-148 Madison-Tanners Creek 138kV 138 22.8 Wind Withdrawn
AB2-065 Madison-Tanners Creek 138kV 138 16 Wind Withdrawn
W4-004 Flat Rock-WF-1 138 11.7 Wind Withdrawn
W4-008 Flat Rock - WF-1 138 11.7 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.