Madison-Tanners Creek substation interconnection queue

1 active project totaling 91.5 MW in the PJM queue, plus 4 with terminal status (shown grayed).

5 PJM queue filings name Madison-Tanners Creek as the point of interconnection, all in IN.

Target commercial operation dates as filed run from Dec 2017 to Dec 2024 (5 filings).

1active projects
91.5active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-297 Bellflower Solar 1 138 91.5 Solar In Service Dec 2024
AA2-148 Madison-Tanners Creek 138kV 138 22.8 Wind Withdrawn Dec 2017
AB2-065 Madison-Tanners Creek 138kV 138 16 Wind Withdrawn Dec 2019
W4-004 Flat Rock-WF-1 138 11.7 Wind Withdrawn Jul 2021
W4-008 Flat Rock - WF-1 138 11.7 Wind Withdrawn Jul 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Madison-Tanners Creek” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Henry County, IN

All 8 PJM queue filings in Henry County, IN.

Other PJM queue substations in Fayette County, IN

All 3 PJM queue filings in Fayette County, IN.

Other PJM queue substations in Rush County, IN

All 5 PJM queue filings in Rush County, IN.