Brokaw-Lanesville substation interconnection queue
5 active projects totalling 52.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).
5active projects
52.8active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD1-148 | HillTopper Wind Farm | n/r | 36.3 | Wind | In Service |
| U4-037 | Brokaw-Lanesville 345kV | 345 | 26 | Wind | Withdrawn |
| AF2-305 | Alta Farms II | 345 | 9.2 | Wind | In Service |
| AG1-398 | Alta Farms II | 345 | 7.3 | Wind | In Service |
| W2-048 | Hilltopper Wind, LLC | n/r | 0 | Wind | In Service |
| X2-022 | Hilltopper Wind Farm | n/r | 0 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.