Brokaw-Lanesville substation interconnection queue
5 active projects totaling 52.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).
6 PJM queue filings name Brokaw-Lanesville as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Dec 2011 to Sep 2024 (6 filings).
5active projects
52.8active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-148 | HillTopper Wind Farm | n/r | 36.3 | Wind | In Service | Sep 2022 |
| U4-037 | Brokaw-Lanesville 345kV | 345 | 26 | Wind | Withdrawn | Dec 2011 |
| AF2-305 | Alta Farms II | 345 | 9.2 | Wind | In Service | Sep 2024 |
| AG1-398 | Alta Farms II | 345 | 7.3 | Wind | In Service | Sep 2024 |
| W2-048 | Hilltopper Wind, LLC | n/r | 0 | Wind | In Service | May 2019 |
| X2-022 | Hilltopper Wind Farm | n/r | 0 | Wind | In Service | May 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Logan County, IL
- Lanesville-Brokaw: 1 active, 26 MW of 4 filed
- Beason: none active of 2 filed
Other PJM queue substations in DeWitt County, IL
No other substation in DeWitt County, IL is named as a point of interconnection in the PJM queue.
Other PJM queue substations in Fulton County, IL
No other substation in Fulton County, IL is named as a point of interconnection in the PJM queue.