Brokaw-Lanesville substation interconnection queue

5 active projects totalling 52.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

5active projects
52.8active MW
6total filed
Queue IDProjectkVMWResourceStatus
AD1-148 HillTopper Wind Farm n/r 36.3 Wind In Service
U4-037 Brokaw-Lanesville 345kV 345 26 Wind Withdrawn
AF2-305 Alta Farms II 345 9.2 Wind In Service
AG1-398 Alta Farms II 345 7.3 Wind In Service
W2-048 Hilltopper Wind, LLC n/r 0 Wind In Service
X2-022 Hilltopper Wind Farm n/r 0 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.