Logan, IL interconnection queue
6 active projects totalling 156 MW in the PJM queue, plus 8 with terminal status (shown greyed).
6active projects
156active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-166 | Lanesville-Brokaw | n/r | 78 | Wind | Withdrawn |
| AI2-167 | Lanesville-Brokaw 345 kV | 345 | 78 | Wind | Withdrawn |
| C01-1067 | TSS 987 Beason 345 kV | 345 | 78 | Wind | Active |
| AI2-368 | TSS 994 345 kV (CIR Increase) | 345 | 77.9 | Wind | Withdrawn |
| AG2-467 | Beason 345 kV | 345 | 69 | Solar | Withdrawn |
| AH1-296 | Beason 345 kV | 345 | 60 | Battery | Withdrawn |
| AI2-151 | AC1-053 Tap 345kV (CIR Increase) | 345 | 48 | Solar | Withdrawn |
| AD1-148 | HillTopper Wind Farm | n/r | 36.3 | Wind | In Service |
| AC1-053 | Top Hat Wind Energy Center | n/r | 26 | Wind | In Service |
| AI2-372 | Hill Topper 345kV (CIR Increase) | 345 | 23.6 | Wind | Withdrawn |
| AG1-236 | Ramble Wind | 345 | 23.4 | Wind | Withdrawn |
| AF2-317 | Whitney Hill Wind Farm | 345 | 15.7 | Wind | In Service |
| W2-048 | Hilltopper Wind, LLC | n/r | 0 | Wind | In Service |
| X2-022 | Hilltopper Wind Farm | n/r | 0 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.