Logan, IL interconnection queue

6 active projects totalling 156 MW in the PJM queue, plus 8 with terminal status (shown greyed).

6active projects
156active MW
14total filed
Queue IDProjectkVMWResourceStatus
AI2-166 Lanesville-Brokaw n/r 78 Wind Withdrawn
AI2-167 Lanesville-Brokaw 345 kV 345 78 Wind Withdrawn
C01-1067 TSS 987 Beason 345 kV 345 78 Wind Active
AI2-368 TSS 994 345 kV (CIR Increase) 345 77.9 Wind Withdrawn
AG2-467 Beason 345 kV 345 69 Solar Withdrawn
AH1-296 Beason 345 kV 345 60 Battery Withdrawn
AI2-151 AC1-053 Tap 345kV (CIR Increase) 345 48 Solar Withdrawn
AD1-148 HillTopper Wind Farm n/r 36.3 Wind In Service
AC1-053 Top Hat Wind Energy Center n/r 26 Wind In Service
AI2-372 Hill Topper 345kV (CIR Increase) 345 23.6 Wind Withdrawn
AG1-236 Ramble Wind 345 23.4 Wind Withdrawn
AF2-317 Whitney Hill Wind Farm 345 15.7 Wind In Service
W2-048 Hilltopper Wind, LLC n/r 0 Wind In Service
X2-022 Hilltopper Wind Farm n/r 0 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.