DeWitt, IL interconnection queue
3 active projects totaling 146 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3active projects
146active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1700 | W4-005 POI 345 kV | 345 | 110.8 | Wind | Active |
| AB2-070 | Alta Farms II | n/r | 26 | Wind | In Service |
| U4-037 | Brokaw-Lanesville 345kV | 345 | 26 | Wind | Withdrawn |
| AF2-305 | Alta Farms II | 345 | 9.2 | Wind | In Service |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.