DeWitt, IL interconnection queue
4 active projects totalling 173.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).
4active projects
173.7active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1700 | W4-005 POI 345 kV | 345 | 110.8 | Wind | Active |
| AH1-541 | Chestnut 345 kV | 345 | 27.7 | Hybrid | Active |
| AB2-070 | Alta Farms II | n/r | 26 | Wind | In Service |
| U4-037 | Brokaw-Lanesville 345kV | 345 | 26 | Wind | Withdrawn |
| AF2-305 | Alta Farms II | 345 | 9.2 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.