Alta Farms II

PJM queue ID AG1-398

Alta Farms II (AG1-398) is listed in the PJM interconnection queue as a 7.3 MW wind project in Fulton County, IL. The filing names Brokaw-Lanesville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 2, 2024.

Queue IDAG1-398
Project nameAlta Farms II
Status (as published)In Service
SubstationBrokaw-Lanesville
Point of interconnectionBrokaw-Lanesville 345 kV
CountyFulton
StateIL
Voltage345 kV
Capacity7.3 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2024-09-02
Source datasetserial

Same substation and county

Brokaw-Lanesville substation: 6 requests in the PJM queue, 5 active totaling 52.8 MW.

Queue IDProjectMWResourceStatus
AD1-148HillTopper Wind Farm36.3WindIn Service
AF2-305Alta Farms II9.2WindIn Service
W2-048Hilltopper Wind, LLC0WindIn Service
X2-022Hilltopper Wind Farm0WindIn Service
U4-037Brokaw-Lanesville 345kV26WindWithdrawn

Fulton, IL: 2 requests in the PJM queue, 1 active totaling 7.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0
MW capacity7.33
MFO197

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.