Substation Scout

Fulton, IL interconnection queue

1 active project totaling 7.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).

1active projects
7.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-364 Brokaw - Lanesville 345 kV (CIR Increase) 345 79.9 Wind Withdrawn
AG1-398 Alta Farms II 345 7.3 Wind In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first