Substation Scout

Fulton, IL interconnection queue

1 active project totalling 7.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
7.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-364 Brokaw - Lanesville 345 kV (CIR Increase) 345 79.9 Wind Withdrawn
AG1-398 Alta Farms II 345 7.3 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.