Lanesville-Brokaw substation interconnection queue
1 active project totalling 26 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
26active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-166 | Lanesville-Brokaw | n/r | 78 | Wind | Withdrawn |
| AI2-167 | Lanesville-Brokaw 345 kV | 345 | 78 | Wind | Withdrawn |
| AC1-053 | Top Hat Wind Energy Center | n/r | 26 | Wind | In Service |
| AG1-236 | Ramble Wind | 345 | 23.4 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.