Lanesville-Brokaw substation interconnection queue

1 active project totalling 26 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
26active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI2-166 Lanesville-Brokaw n/r 78 Wind Withdrawn
AI2-167 Lanesville-Brokaw 345 kV 345 78 Wind Withdrawn
AC1-053 Top Hat Wind Energy Center n/r 26 Wind In Service
AG1-236 Ramble Wind 345 23.4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.