Clinch River 138 kV
PJM queue ID C01-1285
Clinch River 138 kV (C01-1285) is listed in the PJM interconnection queue as a 2 MW gas project in Russell County, VA. The filing names Clinch River as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2026.
| Queue ID | C01-1285 |
|---|---|
| Project name | Clinch River 138 kV |
| Status (as published) | Active |
| Substation | Clinch River |
| Point of interconnection | Clinch River 138 kV |
| County | Russell |
| State | VA |
| Voltage | 138 kV |
| Capacity | 2 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2026-05-01 |
| Source dataset | cycle |
Same substation and county
Clinch River substation: 5 requests in the PJM queue, 5 active totaling 630 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Q43 | Virginia City Hybrid Energy Center - 1 Unit | 534 | Coal | In Service |
| S100 | Virginia City Hybrid Energy Center | 80 | Coal | In Service |
| Y2-067 | Virginia City Hybrid Energy Center | 12 | Coal | In Service |
| C01-1284 | Clinch River 138 kV | 2 | Gas | Active |
Russell, VA: 5 requests in the PJM queue, 4 active totaling 44 MW.
A substation with the same name is named in PJM transmission planning materials: Clinch River (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Appalachian Power Company |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 2.0 |
| MFO | 250.0 |
| Submitted date | 4/22/2026 |
| Last updated | 6/25/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.