Substation Scout

Clinch River substation interconnection queue

5 active projects totaling 630 MW in the PJM queue.

5 PJM queue filings name Clinch River as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Mar 2012 to May 2026 (5 filings).

Transmission owner as filed: AEP (2 filings).

5active projects
630active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
Q43 Virginia City Hybrid Energy Center - 1 Unit 138 534 Coal In Service Mar 2012
S100 Virginia City Hybrid Energy Center 138 80 Coal In Service Mar 2012
Y2-067 Virginia City Hybrid Energy Center 138 12 Coal In Service Nov 2012
C01-1284 Clinch River 138 kV 138 2 Gas Active May 2026
C01-1285 Clinch River 138 kV 138 2 Gas Active May 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Clinch River (AEP, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Wise County, VA

No other substation in Wise County, VA is named as a point of interconnection in the PJM queue.

All 6 PJM queue filings in Wise County, VA.

Other PJM queue substations in Russell County, VA

No other substation in Russell County, VA is named as a point of interconnection in the PJM queue.

All 5 PJM queue filings in Russell County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first