Substation Scout

Clinch River 138 kV

PJM queue ID C01-1284

Clinch River 138 kV (C01-1284) is listed in the PJM interconnection queue as a 2 MW gas project in Russell County, VA. The filing names Clinch River as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2026.

Queue IDC01-1284
Project nameClinch River 138 kV
Status (as published)Active
SubstationClinch River
Point of interconnectionClinch River 138 kV
CountyRussell
StateVA
Voltage138 kV
Capacity2 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2026-05-01
Source datasetcycle

Same substation and county

Clinch River substation: 5 requests in the PJM queue, 5 active totaling 630 MW.

Queue IDProjectMWResourceStatus
Q43Virginia City Hybrid Energy Center - 1 Unit534CoalIn Service
S100Virginia City Hybrid Energy Center80CoalIn Service
Y2-067Virginia City Hybrid Energy Center12CoalIn Service
C01-1285Clinch River 138 kV2GasActive

Russell, VA: 5 requests in the PJM queue, 4 active totaling 44 MW.

A substation with the same name is named in PJM transmission planning materials: Clinch River (AEP, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperAppalachian Power Company
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity2.0
MFO250.0
Submitted date4/22/2026
Last updated6/25/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first