Virginia City Hybrid Energy Center - 1 Unit
PJM queue ID Q43
Virginia City Hybrid Energy Center - 1 Unit (Q43) is listed in the PJM interconnection queue as a 534 MW coal project in Wise County, VA. The filing names Clinch River as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 1, 2012.
| Queue ID | Q43 |
|---|---|
| Project name | Virginia City Hybrid Energy Center - 1 Unit |
| Status (as published) | In Service |
| Substation | Clinch River |
| Point of interconnection | Clinch River 138kV |
| County | Wise |
| State | VA |
| Voltage | 138 kV |
| Capacity | 534 MW |
| Resource (as published) | Coal |
| Resource category | Coal (normalized for filtering) |
| Target commercial operation | 2012-03-01 |
| Source dataset | serial |
Same substation and county
Clinch River substation: 5 requests in the PJM queue, 5 active totaling 630 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| S100 | Virginia City Hybrid Energy Center | 80 | Coal | In Service |
| Y2-067 | Virginia City Hybrid Energy Center | 12 | Coal | In Service |
| C01-1284 | Clinch River 138 kV | 2 | Gas | Active |
| C01-1285 | Clinch River 138 kV | 2 | Gas | Active |
Wise, VA: 6 requests in the PJM queue, 5 active totaling 662.8 MW.
A substation with the same name is named in PJM transmission planning materials: Clinch River (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 534 |
| MW capacity | 534 |
| MFO | 534 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.