Honey Creek Solar
PJM queue ID AF2-078
Honey Creek Solar (AF2-078) is listed in the PJM interconnection queue as a 120 MW hybrid project in White County, IN. The filing names Reynolds-Olive #1 as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2027.
| Queue ID | AF2-078 |
|---|---|
| Project name | Honey Creek Solar |
| Status (as published) | Under Construction |
| Substation | Reynolds-Olive #1 |
| Point of interconnection | Reynolds-Olive #1 345 kV |
| County | White |
| State | IN |
| Voltage | 345 kV |
| Capacity | 120 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | serial |
Same substation and county
Reynolds-Olive #1 substation: 3 requests in the PJM queue, 3 active totaling 334 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-132 | Mammoth Central Energy Center | 180 | Solar | Partially in Service - Under Construction |
| AF1-207 | Hoosier Line Solar | 34 | Solar | Under Construction |
White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-14 | Status change | n/a | Engineering and Procurement → Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 200 |
| MW capacity | 120 |
| MFO | 200 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.