Reynolds - Meadow Lake 345 kV
PJM queue ID C01-1535
Reynolds - Meadow Lake 345 kV (C01-1535) is listed in the PJM interconnection queue as a 100 MW solar project in White County, IN. The filing names Reynolds - Meadow Lake as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2028.
| Queue ID | C01-1535 |
|---|---|
| Project name | Reynolds - Meadow Lake 345 kV |
| Status (as published) | Active |
| Substation | Reynolds - Meadow Lake |
| Point of interconnection | Reynolds - Meadow Lake 345 kV |
| County | White |
| State | IN |
| Voltage | 345 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-06-01 |
| Source dataset | cycle |
Same substation and county
White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | SE DC DevCo, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 100.0 |
| MFO | 200.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.