Substation Scout

Hoosier Line Solar

PJM queue ID AF1-207

Hoosier Line Solar (AF1-207) is listed in the PJM interconnection queue as a 34 MW solar project in White County, IN. The filing names Reynolds-Olive #1 as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of September 15, 2027.

Queue IDAF1-207
Project nameHoosier Line Solar
Status (as published)Under Construction
SubstationReynolds-Olive #1
Point of interconnectionReynolds-Olive #1 345 kV
CountyWhite
StateIN
Voltage345 kV
Capacity34 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-09-15
Source datasetserial

Same substation and county

Reynolds-Olive #1 substation: 3 requests in the PJM queue, 3 active totaling 334 MW.

Queue IDProjectMWResourceStatus
AF2-132Mammoth Central Energy Center180SolarPartially in Service - Under Construction
AF2-078Honey Creek Solar120HybridUnder Construction

White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-23 Status change n/a Engineering and Procurement → Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy180
MW capacity34
MFO180

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first