Colonial Trail West Solar
PJM queue ID AB2-134
Colonial Trail West Solar (AB2-134) is listed in the PJM interconnection queue as a 71.8 MW solar project in Surry County, VA. The filing names Hopewell-Surry as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2019.
| Queue ID | AB2-134 |
|---|---|
| Project name | Colonial Trail West Solar |
| Status (as published) | In Service |
| Substation | Hopewell-Surry |
| Point of interconnection | Hopewell-Surry 230kV |
| County | Surry |
| State | VA |
| Voltage | 230 kV |
| Capacity | 71.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2019-12-01 |
| Source dataset | serial |
Same substation and county
Hopewell-Surry substation: 15 requests in the PJM queue, 4 active totaling 325.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-190 | Fort Powhatan Solar | 105 | Solar | In Service |
| AD1-025 | Spring Grove Solar II | 94.2 | Solar | In Service |
| AC1-216 | Spring Grove I Solar | 54.8 | Solar | In Service |
| AE2-270 | Hopewell-Surry 230 kV | 150 | Hybrid | Withdrawn |
| AD1-151 | Wild Indigo Solar | 90 | Solar | Withdrawn |
| AA2-177 | Fort Powhatan Solar | 56 | Solar | Withdrawn |
| AD2-008 | Hopewell-Surry 230 kV | 16.4 | Solar | Withdrawn |
| AG1-171 | Hopewell-Surry 230kV | 12 | Solar | Withdrawn |
| AG1-172 | Hopewell-Surry 230 kV | 12 | Solar | Withdrawn |
| AG1-173 | Hopewell-Surry 230 kV | 12 | Solar | Withdrawn |
| AG1-174 | Hopewell-Surry 230 kV | 12 | Solar | Withdrawn |
| AG1-175 | Hopewell-Surry 230 kV | 12 | Solar | Withdrawn |
2 more on the substation page.
Surry, VA: 43 requests in the PJM queue, 16 active totaling 1,016.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 142.4 |
| MW capacity | 71.8 |
| MFO | 142.4 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.