Substation Scout

Maplewood Solar

PJM queue ID AC1-083

Maplewood Solar (AC1-083) is listed in the PJM interconnection queue as a 38 MW solar project in Pittsylvania County, VA. The filing names Smith Mountain-Bearskin as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 20, 2022.

Queue IDAC1-083
Project nameMaplewood Solar
Status (as published)In Service
SubstationSmith Mountain-Bearskin
Point of interconnectionSmith Mountain-Bearskin 138kV
CountyPittsylvania
StateVA
Voltage138 kV
Capacity38 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2022-05-20
Source datasetserial

Same substation and county

Smith Mountain-Bearskin substation: 3 requests in the PJM queue, 2 active totaling 45.6 MW.

Queue IDProjectMWResourceStatus
AD1-017Maplewood Solar7.6SolarIn Service
AI2-271Smith Mountain-Bearskin 138 kV14.4SolarWithdrawn

Pittsylvania, VA: 39 requests in the PJM queue, 14 active totaling 751.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity38
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first