Substation Scout

Blue Ridge Solar

PJM queue ID AE1-250

Blue Ridge Solar (AE1-250) is listed in the PJM interconnection queue as a 90 MW solar project in Pittsylvania County, VA. The filing names Smith Mountain-E. Danville as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of January 21, 2028.

Queue IDAE1-250
Project nameBlue Ridge Solar
Status (as published)Under Construction
SubstationSmith Mountain-E. Danville
Point of interconnectionSmith Mountain-E. Danville 138 kV
CountyPittsylvania
StateVA
Voltage138 kV
Capacity90 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-01-21
Source datasetserial

Same substation and county

Pittsylvania, VA: 39 requests in the PJM queue, 14 active totaling 751.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity90
MFO150

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.