# Zoisite substation interconnection queue

3 active projects totaling 1,006.2 MW in the ERCOT queue.

3 ERCOT queue filings name # Zoisite as the point of interconnection, all in Matagorda County, TX.

Target commercial operation dates as filed run from May 2029 to Apr 2030 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Industrial November Project LLC (3 filings).

3active projects
1,006.2active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0141 Bluefox Solar 1 345 402.6 Solar SS Completed, FIS Started, No IA May 2029
28INR0063 Bluefox Solar 2 345 401.8 Solar SS Completed, FIS Started, No IA Jan 2030
28INR0064 Bluefox Solar 3 345 201.8 Solar SS Completed, FIS Started, No IA Apr 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “# Zoisite” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Matagorda County, TX

All 30 ERCOT queue filings in Matagorda County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first