tap W A Parish - STP substation interconnection queue

0 active projects totalling 0 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
21INR0380 Charolais Solar 345 261.6 Solar Cancelled
23INR0168 Charolais Storage 345 150 Battery Cancelled

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.