tap W A Parish - STP substation interconnection queue

0 active projects totaling 0 MW in the ERCOT queue, plus 2 with terminal status (shown grayed).

2 ERCOT queue filings name tap W A Parish - STP as the point of interconnection, all in Matagorda County, TX.

Target commercial operation date as filed: Dec 2026 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
21INR0380 Charolais Solar 345 261.6 Solar Cancelled Dec 2026
23INR0168 Charolais Storage 345 150 Battery Cancelled Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-0521INR0380Terminal status261.6 SS Completed, FIS Started, No IA → Cancelled
2026-10-0523INR0168Terminal status150 SS Completed, FIS Started, No IA → Cancelled

Other ERCOT queue substations in Matagorda County, TX

All 30 ERCOT queue filings in Matagorda County, TX.