Substation Scout

Bluefox Solar 1

ERCOT queue ID 27INR0141

Bluefox Solar 1 (27INR0141) is listed in the ERCOT interconnection queue as a 402.6 MW solar project in Matagorda County, TX. The filing names # Zoisite as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 31, 2029. It records the screening study as complete on June 19, 2024.

Queue ID27INR0141
Project nameBluefox Solar 1
Status (as published)SS Completed, FIS Started, No IA
Substation# Zoisite
Point of interconnection#8754 Zoisite 345kV
CountyMatagorda
StateTX
Voltage345 kV
Capacity402.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-05-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

# Zoisite substation: 3 requests in the ERCOT queue, 3 active totaling 1,006.2 MW.

Queue IDProjectMWResourceStatus
28INR0063Bluefox Solar 2401.8SolarSS Completed, FIS Started, No IA
28INR0064Bluefox Solar 3201.8SolarSS Completed, FIS Started, No IA

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityIndustrial November Project LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Screening study complete2024-06-19
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first