Tap Conoco - Black Cat substation interconnection queue

2 active projects totalling 308.2 MW in the ERCOT queue.

2active projects
308.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0258 Running Iron Solar 138 204.7 Solar SS Completed, FIS Started, No IA
26INR0429 Post Trail Energy 138 103.5 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.