Tap WAP to STP CKT39 (PTI# - CKT 39) substation interconnection queue

2 active projects totalling 743.6 MW in the ERCOT queue.

2active projects
743.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0057 Duffy Solar 345 502.5 Solar SS Completed, FIS Started, IA
26INR0250 Duffy BESS 345 241.1 Battery SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.