Tap WAP to STP CKT39 (PTI# - CKT 39) substation interconnection queue

2 active projects totalling 743.6 MW in the ERCOT queue.

2active projects
743.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0057 Duffy Solar 345 502.5 Solar SS Completed, FIS Started, IA
26INR0250 Duffy BESS 345 241.1 Battery SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.