Tap WAP to STP CKT39 (PTI# - CKT 39) substation interconnection queue
2 active projects totaling 743.6 MW in the ERCOT queue.
2 ERCOT queue filings name Tap WAP to STP CKT39 (PTI# - CKT 39) as the point of interconnection, all in Matagorda County, TX.
Target commercial operation dates as filed run from Dec 2026 to Dec 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Duffy Project Co LLC (1 filing), Duffy Energy Storage LLC (1 filing).
2active projects
743.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 23INR0057 | Duffy Solar | 345 | 502.5 | Solar | SS Completed, FIS Started, IA | Dec 2027 |
| 26INR0250 | Duffy BESS | 345 | 241.1 | Battery | SS Completed, FIS Completed, IA | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Matagorda County, TX
- # Zoisite: 3 active, 1,006.2 MW of 3 filed
- Tap Blessing - Lolita: 2 active, 150 MW of 2 filed
- Tap Conoco - Black Cat: none active of 2 filed
- tap STP to Hillje Ckt 64: none active of 2 filed