Tap WAP to STP CKT39 (PTI# - CKT 39) substation interconnection queue

2 active projects totaling 743.6 MW in the ERCOT queue.

2 ERCOT queue filings name Tap WAP to STP CKT39 (PTI# - CKT 39) as the point of interconnection, all in Matagorda County, TX.

Target commercial operation dates as filed run from Dec 2026 to Dec 2027 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Duffy Project Co LLC (1 filing), Duffy Energy Storage LLC (1 filing).

2active projects
743.6active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
23INR0057 Duffy Solar 345 502.5 Solar SS Completed, FIS Started, IA Dec 2027
26INR0250 Duffy BESS 345 241.1 Battery SS Completed, FIS Completed, IA Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Matagorda County, TX

All 30 ERCOT queue filings in Matagorda County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first