Substation Scout

Tap Blessing - Lolita substation interconnection queue

2 active projects totalling 150 MW in the ERCOT queue.

2active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0347 Midfield PV Project SLF 138 150 Solar SS Completed, FIS Started, No IA
26INR0362 Midfield BESS Project SLF 138 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.