Rock N' Roll Storage SLF
ERCOT queue ID 24INR0234
Rock N' Roll Storage SLF (24INR0234) is listed in the ERCOT interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Brazoria County, TX. The filing names tap Rosharon - Winmil as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of August 1, 2028. It records the screening study as complete on May 27, 2022.
| Queue ID | 24INR0234 |
|---|---|
| Project name | Rock N' Roll Storage SLF |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | tap Rosharon - Winmil |
| Point of interconnection | tap 138kV 44600 Rosharon - 44531 Winmil |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-08-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
tap Rosharon - Winmil substation: 3 requests in the ERCOT queue, 3 active totaling 358 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 24INR0235 | Rock N' Roll Storage Two | 206 | Battery | SS Completed, FIS Started, No IA |
| 24INR0041 | Rock N' Roll Solar SLF | 152 | Solar | SS Completed, FIS Started, No IA |
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Rock N’ Roll Solar, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2022-05-27 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.