(#) SIM GIDEON substation interconnection queue

2 active projects totaling 1,106 MW in the ERCOT queue.

2 ERCOT queue filings name (#) SIM GIDEON as the point of interconnection, all in Bastrop County, TX.

Target commercial operation dates as filed run from Dec 2030 to May 2031 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: LCRA (2 filings).

2active projects
1,106active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
30INR0051 Sim Gideon Combined Cycle 138 880 Gas SS Completed, FIS Started, IA Dec 2030
31INR0011 SIM GIDEON GAS RICE 138 226 Gas SS Completed, FIS Started, IA May 2031

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “(#) SIM GIDEON” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Bastrop County, TX

All 16 ERCOT queue filings in Bastrop County, TX.